Kings Creek

Country Club

Location: Rehoboth Beach, DE

 

This was a two phase project for a prominent country club in Rehoboth Beach, DE. 

Golf course phase:
- mill 7 miles of cart path
- install 30,000 sq ft of concrete path
- install 4,000 tons of HMA path
- construction of 90,000 sq ft of new path with full depth            stone base
- install of 2800 tons of GABC
- Reconstruction of multiple tee box and fairway areas              including one complete reconstruction of hole #4 which          included new tee boxes, culverts and total regrading
- fine grading and install of 800 yards of screened topsoil
- directed subcontractor installing 5 acres of sod.

Parking Lot Phase
- mill 3400 tons of HMA
- excavate base prep and pour of 2500 of of concrete curb
- base prep and install of 3000 sq ft of ICP
- dumpster enclosure and wet laid flagstone install
- concrete pad and flat work install
- storm water pipe and i let’s installed
- rough and fine grading
- install 3200 tons of HMA and striping
 